Opening Hour

Sat -Thu, 8:00 - 4:30

Call Us

0792989892

Email Us

info@pgcc.af

Work Strategy


1. Design and implementation of engineering projects according to accepted international Norms and standards.
2. Using modern tools and machineries.
3. Using all safety equipment is to minimize risk at work site.
4. Utilizing high quality and standard materials.
5. Washing materials (which require washing) such as sand, gravel and brick before using.
6. Preparing Daily Monitoring reports if required.
7. Monitoring the progress of work by relevant engineers.
8. Using database for calculating subtotal and total percentage of done projects.
9. Hiring experienced and young professionals and engineers.
10. Testing materials, concrete and other in qualified laboratories during the progress of work.
11. Initial surveying and drafting.
12. Engineering surveying, drafting the relevant design and check it on the site.
13. Final design for implementation according to all International Codes